Parkside Residence · Bangsar
Parkside Residence FAQ: completion, tenure, layouts and the walk to the LRT
Short answers to the questions buyers ask most about Parkside Residence, from when it completes to how long the lease runs.
When will Parkside Residence be completed?
Completion is expected in January 2030. As of September 2026, work on the second basement slab was in progress.
Who is the developer?
Setia MF SFH Development Sdn Bhd. The tower is part of Setia Federal Hill, the S P Setia group's 52-acre masterplan on Jalan Bangsar.
Is it freehold or leasehold?
Leasehold, for 99 years, with the lease running to 23 June 2116. For example, an owner who collects the keys in 2030 has about 86 years left on the lease.
What type of property is it?
Serviced apartments, in one tower. It is the first residential building in Setia Federal Hill; for example, the rest of the masterplan is planned to include offices, shops, a hotel and an international school around the same park.
How many units are there?
693 homes, with 14 on a typical floor and eight high-speed passenger lifts.
What sizes are there?
Nine layouts from 485 sq ft (1 bedroom) to 1,325 sq ft (3 bedrooms). See the floor plans page for every type.
What does the built-up figure include?
A main parcel plus an accessory parcel. For example, Type A is 463 sq ft of main parcel and 22 sq ft of accessory parcel, 485 sq ft in all.
Can a unit be used as a dual-key home?
The developer shows a dual-key-friendly version of Type B for illustration only. Type B is delivered as 1 bedroom and 2 bathrooms, so any split is the owner's own renovation.
How far is the LRT?
Bangsar LRT station is about a 6-minute walk, about 420 m on foot. KL Sentral is the next stop on the same line.
What fittings come with each unit?
A fire-rated main door with a digital lock, aluminium-framed windows, and 5-star inverter air-conditioners for the living and dining area, bedrooms and study.
Is there a park?
Yes. The tower stands beside the 5-acre central park, and Parkside Boulevard runs from the lobby straight to it.
How do I get the latest figures, car park details and available units?
They differ by layout and floor, and change with each release. Send a WhatsApp message for the current figures and the units still available.
Have a question that is not here?
Ask on WhatsApp